Saturday, October 3, 2015

Project time



Well no longer working full-time, but certain projects need to be done.

Bathroom before, we had already replaced the 
old yellow toilet and former vanity, so we kept those.




The Man did all the destroying, I stayed away, but once things were cleaned up...
that back wall had no insulation!




The oldest laid the floor tile, the Man had to do cuts as I found
I couldn't cut the thick stuff without
the electric tile cutter.





Both the Man and I tiled the surround, did you notice the
new soaking tub? He still did the majority of the cuts and I installed
all the tiles as far as I could reach.
He had to do all
the upper tiling over my five foot something reach.







Finished, a nice collaborative effort by the whole crew.




Finished and in use.